{"id":418,"date":"2017-01-12T03:05:08","date_gmt":"2017-01-12T08:05:08","guid":{"rendered":"http:\/\/me.sites.mtu.edu\/meemscd\/?p=418"},"modified":"2022-09-09T14:39:13","modified_gmt":"2022-09-09T18:39:13","slug":"dg-term-i-timeline","status":"publish","type":"post","link":"https:\/\/me.sites.mtu.edu\/meemscd\/dg-term-i-timeline\/","title":{"rendered":"PPD Section 4 \u2014 Term-I Timeline"},"content":{"rendered":"<h2>1\u00a0\u00a0\u00a0\u00a0 Organization and Formatting<\/h2>\n<h3>1.1\u00a0\u00a0\u00a0 General (same as for other B-Sheets; <a href=\"http:\/\/me.sites.mtu.edu\/meemscd\/dg-b-sheet-organization-and-formatting-general\/\">follow this link for easy reference<\/a>)<\/h3>\n<h3>1.2\u00a0\u00a0\u00a0 Sheet-Specific\u00a0\u2014 Making it All Fit<\/h3>\n<p>Insert a graphical rendering of your Term-I Gantt chart showing as much detail as possible <strong>while maintaining legibly-sized text<\/strong>.\u00a0 If necessary (occasionally, but not often needed), roll-up (minimize) lower-level subtask details to preserve legibility.<\/p>\n<p><strong>Correct-Content Reminder:<\/strong>\u00a0 Milestones show on a Gantt chart as a point in time, not a horizonal bar spanning time.\u00a0 Milestones usually show as a black diamond, and this is accomplished in MS <em>Project<\/em> by entering them as milestones, not as tasks (rather, a zero-duration task).\u00a0 If your Gantt chart shows horizontal bars at the rime of submitting your PUD, you entered them as tasks.\u00a0 We are not looking for tasks at the PUD, just a good effort on milestones and the set-up of the timeline in MS <em>Project<\/em>.<\/p>\n<h2>2\u00a0\u00a0\u00a0\u00a0 Content Presentation<\/h2>\n<ul style=\"list-style-type: disc\">\n<li>There is no specific <em>Page Input<\/em> textbox\/content to be addressed for this page.<\/li>\n<li><span style=\"font-size: 1rem\">This is presented as a Gantt chart, which should be produced in MS <em>Project<\/em>.<\/span><\/li>\n<li><strong>At the Problem Understanding Document (PUD) stage<\/strong>, it will show only the milestones listed on the PPD cover sheet.<\/li>\n<li><strong>At the Concept Selection Review (CSR) stage<\/strong>, it should be a substantial update from that presented in the initial PPD submission at the PUD stage. It should include the following:\n<ul style=\"list-style-type: circle\">\n<li>from the Term-I task list, all main tasks as well as subtasks, focused on the remainder of Term-I<\/li>\n<li>from the adjusted\/updated milestones list, additions and\/or deletions of milestones falling in the Term-I timeframe<\/li>\n<li><strong>task-to-task dependencies\/connectivity<\/strong><\/li>\n<\/ul>\n<\/li>\n<li><strong>At the Problem Continuation Review (PCR) stage<\/strong>, the focus is on Term-II, so no changes are expected here.<\/li>\n<li>There is no specific <em>Page Output<\/em> textbox\/content to be addressed for this page.<\/li>\n<\/ul>\n<h2>3\u00a0\u00a0\u00a0\u00a0 Examples of Great Work<\/h2>\n<h3>Do a great job and be the first!<\/h3>\n<p><u>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/u><\/p>\n<p><em><sub>Project<\/sub><\/em><sub> is a trademark of Microsoft Corporation.<\/sub><\/p>\n<table>\n<tbody>\n<tr>\n<td>\u00a9 2017, William J. Endres<\/td>\n<td style=\"text-align: right\">Updated September 09, 2022<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>1\u00a0\u00a0\u00a0\u00a0 Organization and Formatting 1.1\u00a0\u00a0\u00a0 General (same as for other B-Sheets; follow this link for easy reference) 1.2\u00a0\u00a0\u00a0 Sheet-Specific\u00a0\u2014 Making it All Fit Insert a graphical rendering of your Term-I Gantt chart showing as much detail as possible while maintaining legibly-sized text.\u00a0 If necessary (occasionally, but not often needed), roll-up (minimize) lower-level subtask details to [&hellip;]<\/p>\n","protected":false},"author":35,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,15],"tags":[],"_links":{"self":[{"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/posts\/418"}],"collection":[{"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/users\/35"}],"replies":[{"embeddable":true,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/comments?post=418"}],"version-history":[{"count":11,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/posts\/418\/revisions"}],"predecessor-version":[{"id":2687,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/posts\/418\/revisions\/2687"}],"wp:attachment":[{"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/media?parent=418"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/categories?post=418"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/me.sites.mtu.edu\/meemscd\/wp-json\/wp\/v2\/tags?post=418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}