PPD Section 5 — Term-II Timeline

1     Organization and Formatting

1.1    General (same as for other B-Sheets; follow this link for easy reference)

1.2    Sheet-Specific — Making it All Fit

Insert a graphical rendering of your Term-II Gantt chart showing as much detail as possible while maintaining legibly-sized text.  If necessary (occasionally, but not often needed), roll-up (minimize) lower-level subtask details to preserve legibility.

2     Content Presentation

  • There is no specific Page Input textbox/content to be addressed for this page.
  • Like Term-I, this is presented as a Gantt chart, which should be produced in MS Project.
  • At the Project Continuation Review (PCR) stage, the Term-II chart should include the following:
    • from the Term-II task list, all main tasks as well as subtasks, focused on the remainder of the project (Term-II)
    • from the adjusted/updated milestones list, all milestones falling in the Term-II timeframe
    • task-to-task dependencies/connectivity
  • There is no specific Page Output textbox/content to be addressed for this page.

3     Examples of Great Work

Do a great job and be the first!