All content above the first section (Memorandum Overview) is pre-filled and should need no edits by you. This technical memorandum is accompanied by the Technical Archive Document (TAD). At this stage, there is no need to include your Project Planning Document (PPD) as you are on your way, or not at this point. The purpose of this technical memo is to allow those participating in the review meeting to (re)acquaint themselves to the problem at hand and to see a summarized preview of the content that is the subject of the review. As such, like your past technical memos, it begins with a section summarizing your understanding of the problem. That is followed by a section summarizing your technical progress that is the subject of this review (work refined and completed since the previous review). As with previous technical memos, this one begins with a brief Memorandum Overview indicating these as the elements of content here with direction to the accompanying document.
1 Memorandum Overview Section
Like the PCR, this is again written on your behalf. BUT, read it carefully to understand exactly what your audience is expecting to see. It is your final example to learn from here; though, admittedly, it is nearly identical to the previous ones in form, just updated in specifics. As you move beyond capstone design and into your career, you will usually be starting with a blank sheet of paper on something like this.
2 Problem Understanding Section
This section is comprised of the (what should be) four paragraphs of the “Problem Understanding” section from your PCR tech-memo. To bring this content in, select the content in your PCR tech-memo (all four paragraphs together as a single selection, but NOT including the section heading) and copy. Then, in the PCR template, select “PASTE PROBLEM UNDERSTANDING HERE” (select the entire paragraph by triple-clicking anywhere in the paragraph) and paste. The formatting, if you had it right in the CSR tech-memo, will be correct here; you can select all of the paragraphs and apply “Normal text” paragraph style to be sure.
3 Engineering Requirements Section
This is a direct carryforward from the PCR; while it may seem like old news at this point your requirements fundamentally define what you aim to deliver; furthermore, inclusion here serves the purpose of a quick reference by your audience. To bring this content in, like above, select the content in your PCR tech-memo (the “Engineering Requirements” section less the section heading) and copy. Then, in the PTR template, select “PASTE ENGINEERING REQUIREMENTS HERE” (select the entire paragraph by triple-clicking anywhere in the paragraph) and paste. The formatting, if you had it right in the PCR tech-memo, will be correct here.
4 Overall Solution Concept Section
This is from the PCR technical memo (per guidance for Standard Projects), Section 1; as such, it is expected to be approximately 1½ – 2 pages (2 pages max) in the format provided in the template (Times New Roman 12-point, 1.3 line spacing, 1-inch margins, etc.).
4.1 Standard Projects
As a starting point, copy from your PCR tech-memo. To bring this content in, like above, select the content in your PCR tech-memo (the “Final System-Level Concept” section less the section heading) and copy. Then, in the PTR template, select “PASTE/WRITE SOLUTION CONCEPT HERE” (select the entire paragraph by triple-clicking anywhere in the paragraph) and paste. The formatting, if you had it right in the PCR tech-memo, will be correct here.
Your evaluator for this one is new, and needs a good, concise overview of the concept that is the basis of the reminder of the project work. And, it needs to be absolutely current and complete. As such, you must be sure to update and refine this section from the pasted content that is simply a starting point. As a reminder of what this section should look like, see the PCR Doc-prep Guidance for the Final System-Level Concept subsection.
4.2 “Failure Resolution” Projects
At the time of your PCR, you most likely did not have your final system-level concept in place; and, recall that it was referred to as your “solution” concept/design rather than “system-level” concept/design, in that you were likely focused on a portion of the overall system, the portion where the root-cause of the failure lies. At this point in the project, just refer to it as your system-level concept.
Since you were not complete in this regard at the PCR, you need to write this section based on your work since the PCR. The Standard Project PCR Doc-prep Guidance for the Final System-Level Concept subsection may be helpful in writing this section. Select “PASTE/WRITE SOLUTION CONCEPT HERE” in the template and start typing.
5 Content for Review Section
While you are not explicitly instructed below to include any specific graphics, remember that engineers largely communicate graphically with the text then written “around” the graphics to “fill in the blanks.” A few good graphics in the place of the alternative — piles of text — is expected in a quality piece of work here (and “good” means also annotated!). To help you place graphics in Google Docs with captions that remain attached, a link to a source having a figure+caption placeholder, a table+caption placeholder, and instructions for their use is available in the Figures and Tables Placement Template (FTT) provided at the same time as and with the PTR-TM template.
That said, the text of this section of the tech-memo, in the format provided in the template (paragraph style “Normal text” in Google Docs), should be approximately 1¾ – 2 pages of text (2 pages max; be complete but you must also be selective to make it fit and not spill over to a third page!). Add to that graphics (table and figures). That means that with graphics of legible size it may be 5 – 6 pages. That means 3 – 4 pages worth of graphics; if you have fewer than six (6) graphical elements, you are falling short. Repeating from the CSR and the PCR… while a good graphic does take time to produce, making it seem that writing text is faster, writing good text takes much longer and more iterations than most students realize. And again, like previously, the graphics are not much work at this point since the images generally come straight from the TAD with the simple addition of a caption.
As a reminder again from the previous tech-memo guidance, this is to be treated like an executive summary. That is, this is NOT a diary of what you did, rather it is a summary of the contents of the accompanying TAD (refresh your memory as needed on the content nature of executive summaries by referring to Section 3 of Doc-Prep Guidance — Getting Started). This is repeated yet again because it is so important to get these summaries right, and in particular not write them as a diary of what you did in generating the work-product (findings and results) that makes up the content.
This section should consist of two (2) subsections as described below.
5.1 Subsection 1 — Detail Design
This subsection should summarize the design decisions related to size, shape, and material with an emphasis on the results of your engineering that supports the decisions. Decisions, and any resulting design features (aligned with required functionality), should be concisely but completely described. Those related to safety, manufacturability, and material selection should be covered first and foremost. Secondarily, make note of any design decisions and resulting features that promote reliability, maintainability/serviceability, aesthetics, human factors (ease of use), and environmental impact. Do not write fluff. These must be real design features motivated by these other considerations, not afterthoughts; if you did not design to these considerations, make brief note that “no design decisions and features related to XXXX, YYYYY, and ZZZZZ have been considered.” Here, XXXXX, YYYYY, and ZZZZZ are reliability, maintainability/serviceability, aesthetics, …
5.2 Subsection 2 — Prototype Verification Plan
This subsection should summarize the fully mature prototype verification plan you now have. It should be evolved from what you presented at the PCR. Make note of accommodations — space, instrumentation, and data analysis software — as needed, that are in place or are soon to be put in place. Hypothesize which testing you anticipate to be the most challenging, or the area of your design you expect to be most likely to require refinement once test results are in hand. Specifically address your imminent plans for function-level/subsystem testing to take place before your entire prototype is assembled for system-level testing.
6 Next Steps Section
Following each prompt (e.g., Week 08: ) following the Next Steps section heading, write 1 – 3 sentences describing what your activities will be in each of those weeks. This draws from your Term-II task list as spread across the weekly list according to your Term-II timeline. The challenge here is to be concise yet descriptive. Your objective is to instill confidence that you know what you need to work on to realize success at the end of the project, by the Wednesday of finals week. If certain activities will span multiple weeks, do not repeat their description each week, simply indicate it is “continuing from week(s) XX” where XX are the previous week number(s), for example, “week 11” or “weeks 11 – 12.” Really, you are down to two main activities: prototype manufacture and prototype testing and refinement (hopefully starting about now at the subsystem/function-level, then later at the system level). You talked about your prototype testing and refinement (prototype verification plan) above; be sure to also emphasize your activities for prototype manufacture here.
This section should be ½ – ¾ page in length.
This section should be ½-¾ page in length.
Google Docs is a trademark of Google LLC.
| © 2017, William J. Endres |
Updated February 11, 2023 |