TAD Appendix B — System-Level Concept Data/Assessment

1     Organization and Formatting

1.1    General (same as for other B-sheets; follow this link for easy reference)

1.2    Sheet-Specific — Making it All Fit

Each page-pair in this appendix covers a single system-level concept.  Each round has two pages, the second is needed only if you have more than one end-user use case influencing your concept assessment.  There is plenty of room for the two required graphical renderings from DP Manager.  All pages for up to 9 rounds of 5 concepts each are included.  You will delete those pages for rounds not needed once you are sure they are not needed (see guidance at the bottom of each page).

2     Content Presentation

  • There is no specific Page Input textbox/content to be addressed for this/these page(s).
  • Insert graphical renderings from the DP Manager Excel workbook.  Use the copy table buttons on the Excel worksheet (typically the “Copy Table with Heading” button for use in the TAD).  Include:
    • the data table for the subject system-level concept
    • the assessment table for the subject system-level concept (end-user use case 1 only will fit on the first page for each round)
  • There is no specific Page Output textbox/content to be addressed for this/these page(s).

3     Examples of Great Work

Do a great job and be the first!


Excel is a registered trademark of Microsoft Corporation.

© 2017, William J. Endres Updated September 21, 2022